Hi Dipen,
Have you defined any properties in "Details" column in your Target Data Type?
You can get the output payload from SXMB_MONI...seems there is Data type mis-match issue which is causing this error.
Regards,
Azhar
Hi Dipen,
Have you defined any properties in "Details" column in your Target Data Type?
You can get the output payload from SXMB_MONI...seems there is Data type mis-match issue which is causing this error.
Regards,
Azhar
Hi,,
Try to call the FM
'FI_DOCUMENT_READ'
by passing
I_AWTYP = 'VBRK'
I_AWREF = P_VBELN
get the values ,
and call the FM 'DETERMINE_DUE_DATE' with the values got.
PFB the link,
Regards,
Poornima
Hi Sowmya,
Inserting bulk data you mean to insert a Table(more than one rows) from UI?
In SAP OData framework, we have a standard method, Create_Deep which can help you on this.
Please try to explore deep insert in this forum. Also refer these links,
Step by Step development for CREATE_DEEP_ENTITY operation
For assistance in SAP UI5, you can look into these links,
Create a sales order using the deep insert create request with ODataModel
Deep insert using Model.create()?
Thanks
Naveenraj
Hi,
Would like to know if anyone had this error after upgrading to EHP7?
The error came about when we are trying to purchase some goods using E-CATALOG under the component tab. This is where you go into the vendor's website (inside SAP) and select the appropriate item to be purchased. Then the error pops out upon check out (this is where the data is sent back to SAP to be imported into the component item).
Looking forward for your help on this.
Regards,
Nazarene
Hello Experts,
We upgraded our ECC system to EHP7 For 6.0 and MSSQL DB to 2012. After upgrade I see a new tab 'DB-Specific Properties'
in the technical settings in SE11.
Its set to Column Store for most of tables. It this option correct? or do we need to change it to Row Store? The reason I
am bringing this discussion is because we have noticed our batch jobs are now taking more time. Not sure if this is the
culprit? Please share your thoughts if you have any information about this tab and what is right option to choose for
better MSSQL 2012 performance . Thank you!
In addition to my earlier reply...
You must have a Carry forward sender & receiver budget type with process Receive & Send which you will assign to Budget type to process.
Release Budget type will not perform the transfer of carry forward process
Hi Rajesh
The zip file contains .xlf in .txt format(it's not possible to upload .xlf files here), Please follow below process.
->download the file
->unzip it
->open dashboard designer and drag the 'Scorecard.txt' file into it.
Thanks
Seshu
Hi Jolin,
Please check whether any open Sales orders or Open Deliveries are exist for this material.
Thanks.
Regards,
Praveen Bodduna
hi Dinesh
check bellow thread and under so many threads also there , just go through and come to consuls-ion then stick one thing, research then start the journey
career in SAP functional consultant?
Thanks&Regards
AndakondaRamudu
Hi,
Did u check whether the User is having read and write access?
Also try to ping the Communication channel in monitoring.
Regards,
Dipen.
Hi Varsha,
For me it works only at time, its totally weird .
May be you can restart the device and try or update the EPM to the latest or press that try again button (once it worked for me that way ) . Check out the below URL, it explains about the different MOB errors you get.
http://help.sap.com/businessobject/product_guides/boexir4/en/410_mobiPad_errmsgs_en.pdf
I have raised a OSS message for an issue which i am facing in my BPC 10.1, may be their solution might fix this. Will update here if its fixed.
Regards,
Prithivi Raj
Hi,
Are you getting same error?
Regards,
V Srinivasan
What are the main reasons for a time-out?
It is certainly not the material number, it is the data-volume that needs to be read.
Further he did not say single material, he said material type. (I have in a certain material type >2 million materials in my system)
And this process has to be finished before the border line of maximum foreground run time is exceeded. This is a parameter set by the Netweaver team. Not by an ABAPer.
MC46 is a standard transaction and not a self-made report where an ABAPer could fix his program.
The usual reason for a time-out is a wrong selection, many user select more than they need, instead of thinking while the fill the selection screen they finally just browse through the results to find the few numbers that were really needed.
Be honest, who is nowadays reading a thousand page report from the first line to the last.
If there is no way for a better selection, then the thing has to scheduled in background. But at the same time someone from Basis team should do a performance trace, and should find out how often this kind of selection is needed . Our team does this pro-active. They approach me and ask about the transaction and its functionality after they have seen that this is called often and causes performance issues. Finally they may decide if the create a better index for a faster access
Since it is a standard transaction, one could already check SAP OSS system with keyword MC46 performance to see if there are notes available. And if the situation is worse and no note is given, then they may create an incident at SAP to have SAP Support analyze
But I did not tell anything new, nothing what was not already said in those thousand other discussions.
Dear Expert,
I need your suggestion and help to delete one inbound delivery.
As per business process Good receipt need to done against Inbound Delivery. Stock is sales order stock.
User by mistake consume all the available stock for this sales order through other Delivery.
However when user find this open delivery he tries to compelete the PGR as stock not available in sales order it not allwoing to to comeplete.
WM status is C(complete) which involve HU. As per standard process HU need to deassign from delivery then only delivery can be deleted.
I tried but it not allowing. Even I try to create and confirm TO to move the SU(Storage Unit) to orginal Location(BIN).
How to delete the Inbound delivery as PGR cannot be done??
Kindly Help.
Thanks in advance.
Regards
Tanmoy
Dear Team,
BYD is a complete ERP but i feel there is lack of hold on inventory movement tracking (which is a Must thing in logistics),
Below are few areas which may become key points for promoting SAP BYD with SMB in large scale too.
I am not able to get below (KEY) report are:
1) Serial number tracking : at this point its only informative (no report can be generated or not displayed in In Hand Stock report)
2) Stock aging report : No report on stock aging.
Hence i request you all to please help me to solve above two lacuna (or suggest any workaround available).
Thanks.
Regards
Vishal K
+91 986 725 4565
Hello,
I got the issue I was not changing the DIR.
Thank you for this post !
Hi Nagur,
Its the pay period end date.
Best Regards
Pankaj