Request for help on BOP with RBATP

$
0
0

Hi Team,

 

            I have a doubt regarding BOP with RBATP. Could you please help me regarding this?

 

The below is the scenario:

 

1) I have 3 Products P1, P2, and P3 in both the Locations L1 and L2

2) I have created a Rule Strategy Sequence RSS which has 2 Rule Strategies RS1 and RS2 assigned to it

3) I have created Product Substitution Procedures PSP1 and PSP2, Location Determination Procedure LDP2, Rule Controls RC1 and RC2 and Rule R1 and R2

4) For Rule Control RC1, I have specified the Access Strategy as "Start from top of list" only for Product.

5) For Rule R1, I have assigned Product Substitution Procedure PSP1 and Rule Control RC1.

6) For Rule Control RC2, I have specified the Access Strategy as "Start from top of list" for both Product and Location

7) For Rule R2, I have assigned Product Substitution Procedure PSP2, Location Determination Procedure LDP2, and Rule Control RC2

8) As per my RBATP settings, Rule R1 will be evaluated first and then Rule R2 will be evaluated

 

With the above system setup, I maintain 0 stock for P1, P2, and P3 in both L1 and L2. I create a Sales Order of 10 for P1 in L1. Based on my Rule Settings, Rule R1 will be evaluated first and then Rule 2 will be evaluated. This being the case, is there any way in which I can prevent Rule R2 from being evaluated after Rule R1 gets evaluated?

 

Now, I post a stock of 20 for P3 in L2. I perform the BOP run on the above Sales Order. During the BOP run, I want both Rule R1 and R2 to be evaluated.

 

Could you please let me know if the above situation is possible through Standard GATP? If its not possible, could you please let me know if it can be done through a User-Exit?

 

Thanks in advance for the help and for your time.

 

Thanks & Regards,

Srikanth.