Hi,
We have requirement for removal Strategy
Example:
Stock Bin1: 300
Bin2: 500
Requirement Qty: 500
System is picking 300 from Bin1 and 200 from Bin2. We don’t want to break the pallet. Is it possible to Pick the full quantity of 500 from Bin2?
Thank You